| Release Date | January 19, 2027 |
|---|---|
| Release Owner | Ryan VanderMeulen |
| Corresponding ESR releases | 153.6.0 |
| Nightly cycle length | 4 weeks |
| Beta cycle length | 6 weeks |
| Milestones | |
|---|---|
Deadline to request manual QAQA has been informed via a Jira ticket (Functional, Nimbus/Remote delivery or Embedded QA) about features needing manual testing — more on how to file a Jira ticket here. Test Plans and Cases also require the technical documentation, which should be attached to the ticket. |
November 6 In 36 weeks |
Deadline to request accessibility engineering reviewAccessibility engineering review has been requested (using the |
November 6 In 36 weeks |
Nightly startsThe first day of the cycle is Merge Day. After merging mozilla-central to mozilla-beta, we bump the nightly version number on mozilla-central and a new development cycle starts for Firefox. A new Firefox Nightly is shipped every 12 hours. |
November 9 In 36.5 weeks |
Build ready for QAFeatures with a QA request are ready for testing to assess feature quality and provide a formal test report by the end of Week 2 of the nightly cycle. |
November 20 In 38 weeks |
QA Test Plan approval dueThe QA team appreciates an earlier sign-off from the project teams. The approval milestone will be the final deadline for any feature Test Plan sign-offs. No feedback/sign-off on QAs Feature Test Plan could result in misalignment on testing scope, incomplete test coverage and invalid bugs. |
November 20 In 38 weeks |
Draft beta release notesA draft document was created and shared internally with stakeholders to prepare our final release notes for general availability. This document initially contains a copy of our public beta release notes shipping the week after and will be enriched during the beta cycle with media and final copy. |
December 2 In 39.5 weeks |
String Freeze startsIn order to ensure that our localizers have adequate time to translate strings, please make sure that all string changes have landed by end of day. |
December 4 In 40 weeks |
QA pre-merge regression testing doneQA assess build readiness for shipping to Beta by running a set of Regression test cases and shares a test report. |
December 4 In 40 weeks |
Merge dayThis is the day in the release cycle when we merge mozilla-central into mozilla-beta. This is the end of the development cycle for Firefox 159 and the beginning of our Beta stabilization cycle. |
December 7 In 40.5 weeks |
Beta 1Rolled out to 50% of our beta population. Some experimental features are still activated to watch their behavior on a wider population. These experimental features will be deactivated mid-cycle. |
December 9 In 40.5 weeks |
Beta 2First automated beta of the cycle. It is rolled out to 100% of our beta population. Build starts at 13:00 UTC. |
December 11 In 41 weeks |
SUMO content creationUser affecting changes were identified and provided to the support.mozilla.org team. The support content for this release can now be created and will be translated before RC week. |
December 11 In 41 weeks |
Beta 3Build starts at 13:00 UTC. Stabilization work via uplifts. |
December 14 In 41.5 weeks |
Beta 4Build starts at 13:00 UTC. Stabilization work via uplifts. |
December 16 In 41.5 weeks |
Beta 5 Last early betaOn a regular 4 weeks beta cycle, Beta 5 is the last beta with experimental features still activated. Build starts at 13:00 UTC. Stabilization work via uplifts. |
December 18 In 42 weeks |
Beta 6Build starts at 13:00 UTC. Stabilization work via uplifts. Experimental features are no longer activated at compile time. |
December 21 In 42.5 weeks |
SUMO content localizationNew content on support.mozilla.org team is finalized, uploaded to the server and provided to our localization teams internationally. |
December 21 In 42.5 weeks |
Beta 7Build starts at 13:00 UTC. Stabilization work via uplifts. |
December 23 In 42.5 weeks |
Beta 8Build starts at 13:00 UTC. Stabilization work via uplifts. |
January 4 In 44.5 weeks |
Beta 9Build starts at 13:00 UTC. Stabilization work via uplifts. |
January 6 In 44.5 weeks |
Pre-release QA sign-offA week before the final sign-off, QA shares preliminary test reports for each feature riding the train. This pre-release sign-off can be Green, Yellow or Red. |
January 6 In 44.5 weeks |
Beta 10 Security bugs uplift request deadlineBuild starts at 13:00 UTC. Stabilization work via uplifts. |
January 8 In 45 weeks |
Beta 11Extra beta usually due to a longer beta cycle. Build starts at 13:00 UTC. Stabilization work via uplifts. |
January 11 In 45.5 weeks |
Release notes submission deadlineAll release notes for Firefox were added to the draft document or communicated directly with the release manager. Illustrations such as screenshots and videos were provided. Final Release release notes are created by the release manager on firefox.com. |
January 12 In 45.5 weeks |
Beta 12Extra beta usually due to a longer beta cycle. Build starts at 13:00 UTC. Stabilization work via uplifts. |
January 13 In 45.5 weeks |
Release Candidate Go to buildWe merge our mozilla-beta repository to mozilla-release and close mozilla-beta until the next merge day. We then build our Release Candidate from mozilla-release. This is the build we intend to ship a week later unless we need to build another Release Candidate to fix a major quality or business critical issue. |
January 13 In 45.5 weeks |
Release Candidate Release notes finalizedOur Release Candidate is built and available for testing. |
January 13 In 45.5 weeks |
Release day!We ship Firefox 159 at 14:00 UTC (6AM PST) at 25% rollout. |
January 19 In 46.5 weeks |
Potential Android dot releaseOne week after the release, we evaluate shipping an Android dot release to address identified issues. We can also enable new features on a on a case by case basis if they are suitable for uplift. The decision on shipping or not this dot release for Android is on the release management team. |
January 26 In 47.5 weeks |
Planned dot releaseTwo weeks after the release, we ship a desktop and/or an Android dot release to address identified quality issues with safe fixes ready. We can also enable new features on a on a case by case basis if they are suitable for uplift. We may have to ship other dot releases before that date. If this is the case and post-release quality issues are already fixed and shipped, the decision on shipping or not the planned dot release is on the release management team. |
February 2 In 48.5 weeks |
| Milestones | |
|---|---|
159.0 branch is createdThe |
January 8 |
159.0 release candidate is createdThe 159.0 release candidate is created based on the |
January 8 |
Preliminary QA sign off on 159.0QA gives a preliminary sign off on 159.0. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
January 11 |
Final QA sign off on 159.0 Release notes readyQA gives its final sign off on 159.0. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
January 12 |
159.0 sent to Apple StoreWe submit 159.0 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
January 12 |
159.1 branch is createdThe |
January 15 |
159.1 release candidate is createdThe 159.1 release candidate is created based on the |
January 15 |
159.0 is shipped159.0 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
January 18 |
Preliminary QA sign off on 159.1QA gives a preliminary sign off on 159.1. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
January 18 |
Final QA sign off on 159.1 Release notes readyQA gives its final sign off on 159.1. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
January 19 |
159.1 sent to Apple StoreWe submit 159.1 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
January 21 |
159.2 branch is createdThe |
January 22 |
159.2 release candidate is createdThe 159.2 release candidate is created based on the |
January 22 |
159.1 is shipped159.1 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
January 25 |
Preliminary QA sign off on 159.2QA gives a preliminary sign off on 159.2. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
January 25 |
Final QA sign off on 159.2 Release notes readyQA gives its final sign off on 159.2. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
January 26 |
159.2 sent to Apple StoreWe submit 159.2 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
January 28 |
159.3 branch is createdThe |
January 29 |
159.3 release candidate is createdThe 159.3 release candidate is created based on the |
January 29 |
159.2 is shipped159.2 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
February 1 |
Preliminary QA sign off on 159.3QA gives a preliminary sign off on 159.3. If it is green, we push the build to the External Beta Testers group. Otherwise, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
February 1 |
Final QA sign off on 159.3 Release notes readyQA gives its final sign off on 159.3. If the sign off is red, the dev team fixes the issues reported by QA, uplift them to the release branch and we build another Release Candidate. |
February 2 |
159.3 sent to Apple StoreWe submit 159.3 for review to the Apple Store. If we don`t have a working build by the end of the day, we may not ship this week. |
February 4 |
159.3 is shipped159.3 is shipped on the Apple Store at 3:00 AM UTC with a phased 7 days rollout: |
February 8 |